Best practices facility management: the facility management best practices that survive a small team

Published , updated

Published facility management best practices are mostly written from estates departments, and a single building applying them wholesale ends up with process it cannot staff. The practices below are the ones that survive a team of a few people, in the order they pay off. Each is cheap, each produces something somebody outside the team can read, and none of them requires software to start, which is deliberate: a practice that depends on a purchase does not get adopted while the purchase is being argued for.

Start with the register, and let the schedule derive from it

Write down what the building contains, with location, age and interval. Then let what is due follow from the intervals rather than from a calendar somebody maintains. Those two together remove most of the recurring argument about whether something was done, because the answer stops depending on memory. Everything else in this list assumes they exist.

Price every deferral, and carry it forward

When work is not done, record it with a date and a price rather than dropping it. The priced deferrals become the backlog, the backlog against replacement value becomes the condition index, and the index is the only figure that reliably moves a budget conversation. A team that does nothing else on this list but this one arrives at the next budget round with an argument instead of a request.

Report the same four numbers, the same way, every year

Preventive completion, reactive share, backlog against replacement value, and cost per square foot. Consistency matters more than sophistication: the point is the trend, and a measure redefined between years is worth nothing. Bring the same page to the same meeting annually, and the conversation shifts from individual failures to whether the building is getting better or worse.

Keep contracted work on the same list as your own

Contractor visits belong on the same schedule, against the same assets, with the same record of what was found. A separate list is how sites lose sight of half their plant and how the annual cost figure ends up incomplete in a way nobody notices until an audit. The contract is a source of labor, not a reason for a second system.

Questions people ask about facility management best practices

What about standards and frameworks?

They are useful as a checklist of things to think about and expensive as a program for a small team. Take the parts that produce a number you will use and leave the certification question to whoever is asking for it.

Which practice pays off fastest?

Pricing deferrals. It takes minutes per item, needs nothing to be bought, and it is the difference between arriving at a budget meeting with a list of complaints and arriving with a figure.

How much of this needs software?

None of it to start. The arithmetic runs in a worksheet. Software earns its place when the history has to survive the person who holds it, which is a continuity problem rather than a calculation one.

Sources

Related answers

Start FMlane ProGet FMlane Pro, $24 a month